null
US
Sign In
Sign Up for Free
Sign Up
We have detected that Javascript is not enabled in your browser. The dynamic nature of our site means that Javascript must be enabled to function properly. Please read our
terms and conditions
for more information.
Next up
Copy and Edit
You need to log in to complete this action!
Register for Free
2182875
SAB4#43 Scope Levels
Description
Rita 190-191 HF 198-200
No tags specified
rita 190-191 hf 198-200
Mind Map by
anesio.benna
, updated more than 1 year ago
More
Less
Created by
anesio.benna
over 9 years ago
3
0
0
Resource summary
SAB4#43 Scope Levels
Control Account
Work Package 1
Activity 1
Activity 2
Work Package 2
Activity 3
Activity 4
A distinct, scheduled portion of work performed during the course of a project
The work defined at the lowest level of the WBS for which cost and durtion can be estimated and managed
A management control point where is possible the analysis of work performance data regarding costs, schedule and scope.
Deliverable
Show full summary
Hide full summary
Want to create your own
Mind Maps
for
free
with GoConqr?
Learn more
.
Similar
Crime and Deviance with sociological methods key terms
emzelise1996
Biology: B2.1, cells and simple cell transport; B2.2, tissues, organs and organ systems
Henry Kitchen
C1 B1 & P1 Test
jodie00
Maths Revision
Asmaa Ali
AS Biology- OCR- Module 1 Cells Specification Analysis and Notes
Laura Perry
An Inspector Calls: Eric Birling
Rattan Bhorjee
The Rise of the Nazis
shann.w
Market & Technology Dynamics
Tris Stindt
AS English language terminology revision
Caitlin Hadfield
MCQ practice for research methods, psychology
Ben Armstrong
regular preterite tense conjugation -ar verbs
Pamela Dentler
Browse Library