SAB4#43 Scope Levels

Description

Rita 190-191 HF 198-200
anesio.benna
Mind Map by anesio.benna, updated more than 1 year ago
anesio.benna
Created by anesio.benna over 9 years ago
3
0

Resource summary

SAB4#43 Scope Levels
  1. Control Account
    1. Work Package 1
      1. Activity 1
        1. Activity 2
        2. Work Package 2
          1. Activity 3
            1. Activity 4
              1. A distinct, scheduled portion of work performed during the course of a project
              2. The work defined at the lowest level of the WBS for which cost and durtion can be estimated and managed
              3. A management control point where is possible the analysis of work performance data regarding costs, schedule and scope.
              4. Deliverable
                Show full summary Hide full summary

                Similar

                Crime and Deviance with sociological methods key terms
                emzelise1996
                Biology: B2.1, cells and simple cell transport; B2.2, tissues, organs and organ systems
                Henry Kitchen
                C1 B1 & P1 Test
                jodie00
                Maths Revision
                Asmaa Ali
                AS Biology- OCR- Module 1 Cells Specification Analysis and Notes
                Laura Perry
                An Inspector Calls: Eric Birling
                Rattan Bhorjee
                The Rise of the Nazis
                shann.w
                Market & Technology Dynamics
                Tris Stindt
                AS English language terminology revision
                Caitlin Hadfield
                MCQ practice for research methods, psychology
                Ben Armstrong
                regular preterite tense conjugation -ar verbs
                Pamela Dentler