SAB9#47_Controlling_Scope
  1. I have to do if there is a change in project scope ?
    1. variance analysis.
      1. This tool is the difference analysis between the baseline and the actual work, serves to determine if the plan needs to be corrected. If so, then recommended corrective action, and disseminate through the recommendation a change control
      2. The goal of Control Scope is updating the scope, plan, baseline, and WBS info
        1. This process will tell us if we are right or not, regarding the planned scope and if we are controlling the changes that appear in the project
          Show full summary Hide full summary

          Similar

          The Geography Of Earthquakes
          eimearkelly3
          Plant Structure and Photosynthesis
          mckenziedev
          Physics Revision
          Tom Mitchell
          A Level: English language and literature techniques = Structure
          Jessica 'JessieB
          English Grammatical Terminology
          Fionnghuala Malone
          Know the principles of electricity
          Vito Martino
          CUMULATIVE FREQUENCY DIAGRAMS
          Elliot O'Leary
          IB Chem Flashcards
          j. stu
          GCSE Maths Symbols, Equations & Formulae
          livvy_hurrell
          Camera Angles
          saradevine97
          1PR101 2.test - Část 9.
          Nikola Truong