  1. Activity
    1. PMI considers an activity to be a particular piece of work scheduled for the project.
    2. Work package
      1. The work package is the lowest level on a WBS, the higher levels are used to categorize the work packages.
      2. Control account
        1. Tool that allows for the analysis of work performance data regarding costs, schedule, and scope. Control accounts provide a way to manage and control costs, schedule, and scope at a higher level than the work package.
        Show full summary Hide full summary

        Similar

        SAT Vocabulary
        Muffins31
        Key Events, People and Terms of the French Revolution
        poppwalton
        History- Home Front WW1
        jessmitchell
        Hitler's Chancellorship
        c7jeremy
        An Inspector Calls - Inspector Goole
        Rattan Bhorjee
        Biology Unit 4: Respiration and Photosynthesis
        Charlotte Lloyd
        A View from the Bridge
        Mrs Peacock
        Marriage and Family Life - Edexcel GCSE Religious Studies Unit 3
        nicolalennon12
        AS English language terminology revision
        Caitlin Hadfield
        Leaving Cert Poetry 2017
        Mark O'M