SAB8#130 Risk vs Workarounds
  1. Workaround
    1. A workaround is not a planned response because the problems being addressed were not anticipated ahead of time. Per the name, a “workaround” let’s you “work around” the problem. As soon as it is determined that there is an unanticipated problem, it needs to be addressed, researched and incorporated into the documentation of the project plan
    2. Risk
      1. Contingency plans are developed around those possible issues and they are completed before the threat takes place. These contingency plans should address the objective of the plan, the criteria for activating the contingency plan, the people and responsibilities involved, and the additional details required for implementation.
      Show full summary Hide full summary

      Similar

      Acids and Bases
      silviaod119
      Physics - Energy, Power & Work
      dominique22
      9 History- The Treaty of Versailles
      melgallagher
      An Inspector calls Themes
      anya14
      Revolutions and Turmoil: Russia 1905-1917
      Emily Faul
      GCSE Biology Quiz
      Andrea Leyden
      GCSE Maths: Geometry & Measures
      Andrea Leyden
      GCSE Maths: Statistics & Probability
      Andrea Leyden
      GCSE Maths Quiz: Ratio, Proportion & Measures
      Andrea Leyden
      chemistry: c2
      kristy baker
      Latin Literature Exam Techniques
      mouldybiscuit