SAB7#20_Pre-project conditions
  1. Constraints
    1. Assumptions
      1. Constraints limit the team's options
        1. Boundaries or parameters will the project have to function within
        2. Assumptions that are assumed to be true or reliable
          1. Part or the risk management process
            1. Things we believe but we don't have proof or data
            2. Define project Scope
              1. Those have to be identify and review them for validity during life's project
                1. The Project management plan may need to change
                  Show full summary Hide full summary

                  Similar

                  WAVES
                  toritorx
                  Frankenstein Critic Quotes
                  Chloe Day
                  Structure of the League of Nations
                  saskiamitchell.19
                  Edexcel Additional Science Chemistry Topics 1+2
                  El Smith
                  Biology (B2)
                  Sian Griffiths
                  Algebra - Expansion of Brackets
                  jerick_hartono
                  Penson
                  Roslyn Penson
                  chemsitry as level topic 5 moles and equations
                  Talya Hambling
                  el centro comercial
                  Pamela Dentler
                  Language Analysis
                  Connie Theobald
                  Macbeth Quotes/Themes
                  Michael LEwis