REVIT ARQUITECTURA

Description

Esta evaluación tiene la finalidad de identificar tus conocimientos, por lo que te recomendamos leas con atención las preguntas y marca la opción con la respuesta correcta. Para que puedas realizar este examen, ingresa al siguiente enlace y descarga los archivos que son parte de las instrucciones de esta evaluación. https://studio.bluebeam.com/share/o4ayk4 Agradecemos tu preferencia Mucha Suerte!!!
Alejandro Osio
Quiz by Alejandro Osio, updated 4 months ago
Alejandro Osio
Created by Alejandro Osio almost 2 years ago
11
0

Resource summary

Question 1

Question
1.- Open Materials.rvt Active the From Yard view Apply the Glass – SolarWorld – Tempered Glass material in the Windows In the exhibit, click the image that best represents the color of the Windows after the new material is applied to it.

Question 2

Question
2.- Open Rooms_m.rvt Create a Window Schedule with the following fields (Use the Existing Phase): Family Level Operation Width Filter to view only Level 2 Sort the Schedule by Width, add a footer title, count and totals. Do not itemize each instance. How many Single Window: 1500mm wide Windows are there on Level 2?
Answer
  • 2 VENTANAS
  • 6 VENTANAS
  • 4 VENTANAS

Question 3

Question
Open Warnings.rvt Active the Kitchen – Northwest interior elevation view. Duplicate the view What word is displayed in the far right Windows?
Answer
  • Finish
  • Keep
  • Exit

Question 4

Question
4.- Open Topo_m.rvt Active the Level 2 plan Import the CAD file ACAD-Furniture.dwg using Manual – Center positioning Place the imported file at lotation 1 so that the midpoint on the back of the middle chair is at the intersection of the grid lines on the Observation Deck. Place a dimension from the back of the left end chair to the inside railing as shown. What is the value of dimension 2 from the back of the chair to the inside of the railing?
Answer
  • 615 mm
  • 615.55 mm
  • 61,5 mm
  • 615.9 mm

Question 5

Question
5.- Open Bldg Pad_m.rvt Active the Site floor plans view. Create a Building Pad using the boundary as shown. Set it at Level 1. Make the Height Offset from Level1 to be -3000.0 Edit the Structure of the pad to be 500.0mm thick. What is the volume in meters cubed of the building pad?
Answer
  • 34.973 m3
  • 32.973 m3
  • 34.975 m3
  • 35 m3

Question 6

Question
Open Simple House_m.rvt Active the Level floor plan. Using door 103 in the bathroom, create and name a new door type measuring 900 x 2100 mm. Move the door so that the hinge side is located 100 mm from the inside edge of Wall 1 as shown in the exhibit. Place a dimension between the opposite side of the door and the inside edge of Wall 2. What is the vale of dimension 3?
Answer
  • 528
  • 528.55
  • 528.9
  • 529

Question 7

Question
Open Parking_m.rvt Active the Level 2 floor plans view. Create a new railing using the Handrail – Pipe railing type that is offset 150 mm from the two concrete walls as shown in the exhibit. What is the length of the completed railing?
Answer
  • 14201.6 mm
  • 14201.5 mm
  • 14201.8 mm
  • 14201 mm

Question 8

Question
8.- Open Detiails_m.rvt Active the Typical Foundation Detail view. Above the foundation, place a repeating detail of Roman Brick along the side of the Wall similar to what is shown in the exhibit. (Extend the brick outside the view). How many full courses (bricks) do you see in the view?
Answer
  • 8
  • 9
  • 7
  • 5

Question 9

Question
9.- Open Simple House_m.rvt Active the Level 1 view. Select the dimension string along the left end of the building that measures gridlines A-C. Set the gridlines so that they are equidistant from one another. What is the dimension value of EQ?
Answer
  • 3000
  • 2000
  • 300.0
  • 4000

Question 10

Question
10.- Open Rooms_m.rvt Active the Room Schedule. Sort the Schedule by Level, adding a header and footer. Calculate the totals for the Area column. What is the total area for the rooms on Level 2?
Answer
  • 96
  • 99
  • 97
  • 95

Question 11

Question
Open Placement_m.rvt Active Sheet A102 – Plans. Create a Guide Grid and change Spacing to 200 mm. Move the Level 1 view so that the A1 grid intersection is congruent with the lower right intersection of the first full grid intersection. What is the distance between column grid G and the nearest horizontal guide gridline?
Answer
  • 10
  • 11
  • 9
  • 7

Question 12

Question
Open Stairs_m.rvt Active the Stairs view. Using the Stair by Component tool, add a stair the provided dimensions and reference planes as guides. Set the following properties: For the stair type, select Monolithic Stair. For Base Level, select Level 1 For Top Level, select Level 2 For Actual Tread Depth, enter 280 mm For Desired Number of Risers, enter 17. For Actual Run Width, enter 1200. What is the length of dimension 1?
Answer
  • 1440
  • 1440.5
  • 14440.5
  • 14.40

Question 13

Question
Open Materials.rvt Active the Level 1 view. Find the cabinet in Living Room 106. What material is assigned to the drawer handles?
Answer
  • Metal – Stainless
  • Stainless -Metal
  • Stainless Metallic
  • Stainless Steel

Question 14

Question
Open Simple House_m.rvt Active the Typical Foundation Detail view. Create a filled region using the Concrete fill pattern inside the floor area as shown in the exhibit. What is the area in meters squared of the filled region?
Answer
  • 0.124 m2
  • 0.1245 m2
  • 0.1238 m2
  • 0.1224 m2

Question 15

Question
15.- Open Concept_m.rvt Create mass floor for Levels 1-5 What is the floor area in meters squared of the mass floor associated with Level 5? otra What is the floor volume in meters cubed of the mass floor associated with Level 4?
Answer

Question 16

Question
Open Simple House_m.rvt Active the Level 1 – Room Legend floor plan. Tag all the rooms in this view using the M_Room Tag: With Area family type. Change the Room Area Computation setting for the Project to At Wall Center. What is the area in meters squared of the Kitchen & Dining room?
Answer
  • 74 m2
  • .74 m2
  • 7.4 m2
  • 740 m2

Question 17

Question
Open Footing_m.rvt The concrete walls in this Project use the Stacked Wall: Concrete with Footing. Active the Type Properties for this existing Wall type. Add the Footing 500 mm Wall type to the bottom of the stacked Wall with a height of 275 mm. Navigate to the Wall Material Takeoff Schedule. What is the Material Volume in meters cubed of the Concrete – Cast in Situ material?
Answer
  • 61.60 m3
  • 61.61 m3
  • 61.59 m3
  • 61.601 m3

Question 18

Question
Open Ottoman.rvt Active the Level 1 floor plan. In room Living 106, select one of the components: Sofa – Ottoman. Select Edit Family to open the Family Editor. Activate the Reference Level view. Using Model Text, enter the string Right and place it centered in the ottoman. Change the Model Text Depth to 400. Load into the Project and overwrite the existing version and its parameter values. In the exhibit, click on the Sofa-Ottoman components which have been rotated and are NOT right-reading.
Answer
  • 3, 5 y 6
  • 2, 5 y 6
  • 3, 4 y 6
  • 3, 5 y 4

Question 19

Question
Open Phasing_m.rvt Active the Level 2 floor plan. Set the view to show the New Renovations phase. What is the area in meters squared of Hall 207?
Answer
  • 13
  • 14
  • 12
  • 10

Question 20

Question
Open Seating.rvt Active the Level 1 floor plan. Edit the Dining Table A1 family. Move the room calculation point just below the lowest reference plane as shown in the exhibit. Reload the family back into the Seating.rvt Project and overwrite the existing parameters. Open the furniture Schedule. What room are the two Dining Table A1 elements listed in?
Answer
  • Food Prep
  • Deep Prep

Question 21

Question
Open Simple House_m.rvt Active the North elevation view. Create a Parapet Level 3100 mm above the Roof Line level. Change the Elevation Base of the Level type to Survey Point. What is the elevation in millimeters of the Parapet level?
Answer
  • 12200
  • 122200
  • 1200
  • 122000

Question 22

Question
Open Simple House_Central.rvt Active the Level 1 floor plan. Turn on the option to gray the inactive workset graphics. Make Workset3 the active workset. In the exhibit, click the image that accurately represents the floor plan display

Question 23

Question
Open Simple House_Central.rvt Active the Level 1 floor plan. Set the Worksharing Display to Worksets. What color is displayed at the column grid bubble indicated in the exhibit?
Answer
  • PURPLE
  • PINK
  • CYAN
  • GREEN
  • YELLOW

Question 24

Question
Open Attach_m.rvt Active the Level 2 floor plan view. Place a Wall section as shown in the exhibit and open the view. Select the partition Wall at Level 2 and attach the top pf the Wall to the roof. What is the area in meters squared of the Wall after the attachment?
Answer
  • 24.82 m2
  • 2.978 m3

Question 25

Question
Open Attach_m.rvt Active the Level 2 floor plan view. Place a Wall section as shown in the exhibit and open the view. Select the partition Wall at Level 2 and attach the top pf the Wall to the roof. What is the volume in meters cubed of the Wall after the attachment?
Answer
  • 2.978 m3
  • 24.82 m2

Question 26

Question
Open Legends_m.rvt Create a new Legend view. Name it FURNITURE LEGEND. Assign the scale at 1 : 50. Place the Floor Plan and Right Side Elevations legend components for the following: Furniture : Chair 1 Furniture : Chair 2 Furniture : Chair 3 In the exhibit, click on the image that accurately represents the right elevation for Chair 2.

Question 27

Question
Open Room Legend.rvt Active the Level 1 – room Legend floor plan view. Assign the Area color scheme to the view. Using the exhibit, what room legend color name is displayed in the Living area when the color scheme is applied?
Answer
  • CYAN
  • GREEN
  • ORANGE
  • YELLOW
  • PINK

Question 28

Question
Open Materials.rvt Active the Living Room – Iso 3D view. What is the value of the Mark property of the side table has been hidden in the view?
Answer
  • 6
  • 5
  • 4
  • 7

Question 29

Question
Open Warnings.rvt Review the Project´s warnings. Locate Warning 2 that indicates the highlighted Wall overlap. Select the Wall with id 428745 and use the Show tool to find the Wall in the Project. In the exhibit, what number corresponds to the Wall that is highlighted?
Answer
  • 6
  • 4
  • 7
  • 5

Question 30

Question
Open Wall Components_m.rvt Active the Level 2 floor plan. Change the highlighted Wall (only the one Wall) so that each of the Finish layers on both sides structure are 22 mm thick. What is the volume in meters cubed of this Wall?
Answer
  • 0.699 m3
  • 06.99 m3
  • .00699 m3
  • 0.6999 m3

Question 31

Question
Open Topo_m.rvt Active the 3D view. Create a toposurface from the CAD import on-screen using only the following layer: C-TOPOMINR-2. What is the Surface area in meters squared of the completed toposurface?
Answer
  • 3971.268 m2
  • 39712.68 m2
  • 397.1268 m2

Question 32

Question
Open Simple House_m.rvt Active the Typical Floor Wall Connection detail view. Change the floor to Floor Type 4. Select image below that corresponds with the detail view.

Question 33

Question
Open Monitor_m.rvt Active the Site plan. Copy/Monitor using the linked file Parking_m.rvt. Change the options so that the original Wall type Retaining – 300 mm Concrete copies to the same type. Copy and monitor the four concrete walls of the linked file. Select Wall 1 and view the properties. The top constraint of monitored Wall 1 is set to align up to which level?
Answer
  • Roof Line
  • Roof
  • Line Roof

Question 34

Question
Open Simple House_m.rvt Active the East building elevation view. Select curtain Wall 1. Change the Horizontal Grid Justification to Center. What is the area in meters squared of panel 2?
Answer
  • 3.627
  • 36.27
  • 3.628

Question 35

Question
Open Ceiling.rvt Create a Reflected Ceiling Plan view for Level 2. Create a generic ceiling in the bedroom with a Height Offset of 2700 mm as show by the area outlined in red. Note: The ceiling will outline the inside edge of the bedroom and bathroom walls. What is the perimeter of the ceiling?
Answer
  • 20.4458 m
  • 204.458 m
  • 24.0458 m
Show full summary Hide full summary

Similar

Biology- Genes and Variation
Laura Perry
GCSE Biology heart notes
Kamila Woloszyn
History of Psychology
mia.rigby
IGCSE Physics formulas
Imani :D
English Poetry Key Words
Oliviax
An Inspector Calls: Mrs Sybil Birling
Rattan Bhorjee
Biological Psychology - Stress
Gurdev Manchanda
Crime and Punishment Flashcards - Edexcel GCSE Religious Studies Unit 8
nicolalennon12
Development of Cold War Tensions
c7jeremy
A-LEVEL ENGLISH LANGUAGE : Key Theorists
Eleanor H
Anatomie - sistemul respirator 1
Eugeniu Nicolenco