Question 1

Question
An architect's preliminary estimate of construction cost would consider all of the following EXCEPT: I. labor and materials supplied by the owner. II. cooling towers. III. land acquisition costs. IV. the architect's fee. V. metal curtain wall systems
Answer
  • A. I only
  • B. I and IV
  • C. None, everything would be considred
  • D. III and IV

Question 2

Question
An architect who prepares a preliminary estimate of construction cost according to the subsystems method
Answer
  • A. considers one set of subsystems for concrete buildings and a different set for steel buildings.
  • B. can easily analyse the cost of alternative exterior wall systems.
  • C. would most likely use this method during the schematic design phase.
  • D. would be performing an additional service under the AIA Agreement between Owner and Architect.
Show full summary Hide full summary

Similar

Lord of the Flies
lmg719
transition metals
Ella Wolf
Religious Studies - Keywords.
Ready2learn
Changing Urban Environments
John Ditchburn
GCSE Biology Unit 1 AQA
Archie Clay
AS Biology Biochemistry and Cell Structure
sian_c_evans
P4: Explaining motion
thegeekymushroom
USA and Vietnam (1964-1975) - Part 1
Lewis Appleton-Jones
AQA A2 Biology Unit 5 Chapter 11: Muscle Contraction
Charlotte Lloyd
PSBD TEST 1
amrik.sachdeva
Specific topic 7.8 Timber (Applied treatments)
T Andrews