Question 1

Question
What stage in the project lifecycle does testing come into?
Answer
  • Initiation
  • Planning
  • Execution
  • Evaluation

Question 2

Question
The SMART objectives are Specific, Measureable, Achievable, Realistic and Time Bound
Answer
  • True
  • False

Question 3

Question
Tick the two boxes that are properties of a Pert Chart
Answer
  • Nodes
  • Dates
  • Critical Path

Question 4

Question
Tick the box that has the correct inputs and outputs for the Initiation part of the project lifecycle
Answer
  • Input: Feasibility Report Output: Project and Test Plans
  • Input: User Requirements Outputs: Feasibility Report
  • Input: Test Results Output: Final Evaluation

Question 5

Question
This software type is used to store data that usually involves calculations. What type of software is it?
Answer
  • Presentation Software
  • Database
  • Spreadsheet
  • Word processing

Question 6

Question
An integrated document (mail merge) is a feature of Desk Top Publishing
Answer
  • True
  • False
Show full summary Hide full summary

Similar

The Cold War
dottydiva96
GCSE Chemistry C1 - Carbon Chemistry ATOMS, MOLECULES AND COMPOUNDS (Easy)
T W
English Grammatical Terminology
Fionnghuala Malone
Know the principles of electricity
Vito Martino
Physics P1
Phoebe Drew
BELIEVING IN GOD- UNIT 1, SECTION 1- RELIGIOUS STUDIES GCSE EDEXCEL
Khadijah Mohammed
GCSE Maths: Statistics & Probability
Andrea Leyden
Macbeth Essay Notes
Mel M
EXAM 1 - ENABLING FEATURES
kristinephil558
General questions on photosynthesis
Fatima K
Repaso prueba Revalida Enfermeria 2016 Parte:2
Rodrigo Lopez