The design team quiz.

Description

Identify members of the construction design team and their roles.
Tom Jones7007
Quiz by Tom Jones7007, updated more than 1 year ago
Tom Jones7007
Created by Tom Jones7007 about 10 years ago
725
5

Resource summary

Question 1

Question
Who is responsible for translating ideas into sound accurate drawings that the contractor can follow?
Answer
  • Clerk of works
  • Resident engineer
  • Architectural technologist

Question 2

Question
Which of the following is employed directly by the client, who will want to assurance that a contractor is producing a building that meets the specification in terms of both materials and workmanship?
Answer
  • Building services engineer
  • Facilities manager
  • Quantity Surveyor
  • Interior designer
  • Clerk of works

Question 3

Question
Who is sometimes used on contracts where the internal finish and décor is important or of a prestigious nature?
Answer
  • Resident engineer
  • Interior designer
  • Architect
  • Client

Question 4

Question
Who will produce precise and accurate details of construction technology since quantity surveyors will need to read these drawings so that the bills of quantities and the specifications can be drawn up?
Answer
  • Architect
  • Architectural technologist
  • Quantity surveyor
  • Building services engineer

Question 5

Question
Which member of the design team will have an understanding of health, safety and welfare legislation and its implications on design and construction?
Answer
  • Interior designer
  • Structural engineer
  • Architect
  • Resident engineer

Question 6

Question
Who will be responsible for the effective use of heat, light, acoustics, and other electrical appliances?
Answer
  • Facilities manager
  • Clerk of works
  • Building services engineer
  • Architect

Question 7

Question
Who will maintain the building once it has been built.
Answer
  • Landscape architect
  • Building services engineer
  • Facilities manager
  • Interior designer

Question 8

Question
This person will design the load of the building and ensure that each component is designed to safely withstand the loads which are imposed on the building.
Answer
  • Architect
  • Resident engineer
  • Structural engineer
  • Landscape architect

Question 9

Question
This person does not have the authority to impose variations or changes to the design but is there to inspect and visit the site frequently?
Answer
  • Structural engineer
  • Clerk of works
  • Resident engineer
  • Architect

Question 10

Question
This person is usually based close to the construction works, or on the site itself.
Answer
  • Landscape architect
  • Resident Engineer
  • Architect
  • Quantity surveyor

Question 11

Question
Frequently speculative housing projects will benefit from the person who designs open spaces and leisure areas , usually this person is employed as the?
Answer
  • Architectural technologist
  • Quantity surveyor
  • Landscape architect
  • Facilities manager

Question 12

Question
These people will discuss the design brief and different solutions to produce an agreed design and specification.
Answer
  • Client / Resident engineer
  • Architect / Building services engineer
  • Quantity surveyor / Facilities manager
  • Architect /client

Question 13

Question
These people will interact about the structural feasibility of the agreed design and come up with any amendments as necessary.
Answer
  • Quantity surveyor / Client
  • Architectural Technologist / Structural Engineer
  • Architect / Structural Engineer
  • Structural Engineer / Building Services Engineer

Question 14

Question
These people will discuss the clients budget and cost s of the various schemes.
Answer
  • Architect / Quantity Surveyor / Client
  • Resident Engineer / Client / Quantity Surveyor
  • Quantity Surveyor / Client / Facilities Manager
  • Building Services Engineer / Client / Quantity Surveyor

Question 15

Question
These people will discuss, amend or negotiate tenders and quotations for work.
Answer
  • Principal Contractor / Quantity Surveyor / Client
  • Principal Contractor / Quantity Surveyor / Clerk of Works
  • Principal Contractor / Quantity Surveyor / Architect
  • Building Services Engineer / Quantity Surveyor / Principal Contractor

Question 16

Question
Which design team members will agree on the final account on completion of the work.
Answer
  • architect / structural engineer
  • architect / quantity surveyor / client
  • Principal contractor / architect / quantity surveyor
  • Resident engineer / quantity surveyor / Architectural technologist
Show full summary Hide full summary

Similar

Newton's Three Laws of Motion
PatrickNoonan
River Processes and Landforms
1jdjdjd1
Respiratory System
bridget.watts97
George- Of mice and men
Elinor Jones
P2 Radioactivity and Stars
dfreeman
Business Studies Unit 1
kathrynchristie
GCSE Chemistry C2 topic notes
imogen.shiels
Physics P2
Phoebe Drew
AS Chemistry - Enthalpy Changes
Sarah H-V
PSBD TEST # 3_1
Suleman Shah
Computer Systems
lisawinkler10