Question
Which one of the following does not form part of the commissioning process?
Answer
  • a. Soundness testing
  • b. Visual inspection
  • c. Flushing the system
  • d. Fitting plumbing appliance

Question 2

Question
Which one of the following parts of the Building Regulations deals with building structure?
Answer
  • a. Part A
  • b. Part B
  • c. Part F
  • d. Part L.

Question 3

Question
What does LCS stand for?
Answer
  • a. Long Coil Strand
  • b. Low Carbon Steel
  • c. Low Copper Steel
  • d. Loose Cover Sheet.

Question 4

Question
Which one of the following should be used to protect the area you are working in?
Answer
  • a. Safety shoes
  • b. Plywood
  • c. Dust sheets
  • d. Heat mat.

Question 5

Question
Which one of the following is the correct horizontal clipping interval for 15mm copper tube?
Answer
  • a. 1.2m
  • b. 1.5m
  • c. 1.8m
  • d. 2.0m.

Question 6

Question
At what point should an inhibitor be added to a central heating system during commissioning?
Answer
  • a. During the first flush
  • b. Before flushing
  • c. During the final fill of the system
  • d. Before cleaning the pipework.

Question 7

Question
Which one of the following types of screw is shown in the image?
Answer
  • a. Phillips
  • b. Pozidrive
  • c. Slotted
  • d. Mirror.

Question 8

Question
Which one of the following grades of copper is used for microbore central heating pipework?
Answer
  • a. R220
  • b. R250
  • c. R290
  • d. R300.

Question 9

Question
Which specialist tool may be required when removing the body of a non-rising pillar tap?
Answer
  • a. Stillson
  • b. Basin wrench
  • c. Circlip pliers
  • d. Adjustable spanner.

Question 10

Question
What type of fitting is shown in the image?
Answer
  • a. Compression tee
  • b. Compression coupling
  • c. Compression elbow
  • d. Compression tank connector.

Question 11

Question
What is the name of the tool shown?
Answer
  • a. Mole grips
  • b. Stillson
  • c. Basin wrench
  • d. Spirit level.

Question 12

Question
Which one of the following types of fitting would most likely be used to joint polybutylene pipes together?
Answer
  • a. Soldered
  • b. Threaded
  • c. Solvent weld
  • d. Push fit.

Question 13

Question
Which one of the following sets of tools should be used to cut a waste hole in brickwork?
Answer
  • a. Claw hammer and bevel edge chisel
  • b. Ball pein hammer and screwdriver
  • c. SDS drill with diamond core drill
  • d. SDS drill with hole saw.

Question 14

Question
Which one of the following would require the application of flux?
Answer
  • a. Soldering two pieces of copper pipe together using end feed capillary fittings
  • b. Threading steel pipe
  • c. Jointing steel pipework
  • d. Jointing two pieces of copper pipe together using press fit fittings.

Question 15

Question
Sleeving pipework helps to prevent which of the following?
Answer
  • a. Movement of pipework
  • b. Damage from corrosion
  • c. Damage from pipe movement
  • d. Cleaning of pipework.

Question 16

Question
What component does the symbol represent?
Answer
  • a. Stop valve
  • b. Gate valve
  • c. Service valve
  • d. Motorised valve

Question 17

Question
Which one of the following tools is used to form LCS?
Answer
  • a. Hand bender
  • b. Hydraulic bender
  • c. Scissor type bender
  • d. Tube bender.

Question 18

Question
A customer’s joist has a span of 4m – how near to the supporting wall can the notch start?
Answer
  • a. 350mm
  • b. 315mm
  • c. 280mm
  • d. 265mm.

Question 19

Question
A plumber would use the assembly drawings for an appliance when:
Answer
  • a. Installing the hot and cold pipework
  • b. Before commissioning an appliance
  • c. When setting the temperature controls of the appliance
  • d. When identifying a spare part.

Question 20

Question
The maximum safe vertical chasing depth for a wall is:
Answer
  • a. One-third of the depth of the wall
  • b. One-quarter of the depth of the wall
  • c. Half of the depth of the wall
  • d. One-eighth of the depth of the wall.
Show full summary Hide full summary

Similar

Unit 202: Electrical principles and processes for building
james crowley
Unit 205: Cold water systems - practice test
james crowley
Unit 203 Revision Question Bank No.2
Oliver Balay
Unit 201: Health and safety in building services engineering
james crowley
Unit 206: Domestic hot water systems practice test
james crowley
Colour theory quiz
james crowley
Unit 108 Above Ground Drainage
james crowley
Structure of the construction industry
james crowley
Applying paper to walls and ceilings level 1
james crowley
Producing specialist decorative finishes quiz
james crowley
Unit 103 - Environmental and Sustainability Measures in Domestic Dwellings
james crowley