Overhead Lines

Description

Element 5 Page 2
Yasir Kayani
Mind Map by Yasir Kayani, updated more than 1 year ago
Yasir Kayani
Created by Yasir Kayani over 9 years ago
11
1

Resource summary

Overhead Lines
  1. where possible, lines should be diverted or made dead before work - pre-planning is vital
    1. it may be possible to make line dead for short periods - work can be planned for these times
      1. liaise with local electricity supplier or owner of lines on precautions required
        1. training should be provided in precautions, especially dangers of carrying long objects e.g. ladders near lines
          1. cranes/excavators, etc may need to be modified by fitting physical restraints
            1. adequate supervision should be provided
              Show full summary Hide full summary

              Similar

              Safe Movement of Vehicles
              Yasir Kayani
              Work at Height
              Yasir Kayani
              DSE Risk Assessment
              Yasir Kayani
              Hand Tools
              Yasir Kayani
              Portable Electrical Equipment
              Yasir Kayani
              Violence at Work
              Yasir Kayani
              Temperature
              Yasir Kayani
              Substance Misuse
              Yasir Kayani
              Manual Handling
              Yasir Kayani
              Cranes
              Yasir Kayani
              Electrical Control Measures
              Yasir Kayani