Created by Oliver Balay
over 8 years ago
|
||
Question | Answer |
Manufacturer's Instructions | Manufacturer's Instructions will describe how to assemble or install equipment and appliances. |
Work Schedule | A work schedule indicates the sequence of work from start on site to completion of the contract. |
Site Plan | A site plan shows the location of the working site. |
Scaled Drawings | Scaled drawings shows the size of rooms, position of equipment accessories and appliances. |
Schematic Diagram | It shows how a system works using technical symbols. |
Solid / Concrete Floor | |
Wooden / Chipboard / Sheet Flooring | |
Discuss what is hazardous about the following image? | |
The Building Regulations 2010 | They exist to ensure the health and safety of people in and around all types of buildings (i.e. domestic, commercial and industrial). They also provide for energy conservation, and access to and use of buildings. They are broken into different parts for using letters. (eg. A, B, E, L, M & P) Part A of the Building Regulations refers to the STRUCTURE of a building i.e. depth of chases in walls and sizes of holes and notches in floor and roof joists. |
Floorboards and Joists | Before starting any floor work in a customer's property you should lay down dust sheets and ask to remove any valuable items/equipment in the affected areas. |
How to maintain a good working relationship? | Good communication, resolving disputes, holding regular site meetings, tool box talks, and maintaining professionalism at all times. |
Want to create your own Flashcards for free with GoConqr? Learn more.